Specified and Developed Automated Production Final Test System Posted by Bob Duffy on June 19, 2017 in Manufacturing Projects Asia, Hardware, Requirements, Specifications View
Evaluated Design Changes for Adequacy of Design Verification Posted by Bob Duffy on June 12, 2017 in Design Projects Design Changes, Design Verification, Requirements, Risk Analysis, Specifications View
3 C’s of Specifications Posted by Bob Duffy on September 10, 2013 in Design, Device Tips Design Input, FDA, Medical Devices, QSR, Specifications View
Risk Analysis & Product Requirements Posted by Bob Duffy on December 14, 2010 in Design, Device Tips Design Validation, Design Verification, Product Requirements, QSR, Risk Analysis, Specifications View